I have a report that i created to automatically send me on a daily basis a list of all unassigned tasks. See my post here. The issue i have with the report is that i cannot check the Root folder with this method as it is not an option for reporting. In a perfect world, all tasks would be assigned, and be in a folder, but sometimes it happens that it does not get assigned nor placed in a folder. I think the ability to choose the root directory for reporting would be a big plus.
Thank you for your consideration.
M