Currently the Workload chart can be filtered with the filter presets. And only apply to the current user. These filter presets cannot pushed to other user, to make sure everybody is using the same views.
The backlog box of the workload chart is filtered by configurations in the setting menu. And this filtering applies to ALL users.
It would be preferred if the filtering of both the chart of (user) resources would work consistent with the filtering of the backlog box:
- Filters should both be for all users or current user, in the same way for Workload and Backlog box.
- If the filter applies to only the current user, it should be possible to make the preset filter 'default', so it can also be used by others.
- Additionally for the backlog box:
- It should be possible to filter the backlog box on job roles. (currently if filtered on a specific 'job role' as assignee, still all job roles are visible)
- It should only show projects which have tasks with scheduled dates. Because else it will be 'empty' project lines in the workload chart