Hi. Im wondering if any knows if its possible to be able to show manual progress of a task/project ratehr than Wrike AI calculates the percentage progress through Completed tasks etc?
The ability is so we can drive the progress manually based on a single task and not driven by the AI. I know w can create a custom field and then have that as a manual % but that means a seperate column and wondered if i could override manually the progress column. thanks