I’m trying to use the Excel Import tool to add one new top‑level task (with its subtasks) into existing projects. Each project already has ~20 tasks based on our template. I need the imported task to appear in a very specific position within the project’s task list. Wrike’s task numbering is automatic and based on position, so inserting a new task should renumber everything after it. However, when I use the Excel Import, Wrike always places the new task at the top of the task list, no matter what I put in the “Key” column. So I end up having to manually drag the task up into the correct spot every time.
Is there any way to import a task directly into a specific position in an existing project such without manually dragging it afterward? Or is manual reordering still the only option in Wrike?